Place of Origin: | Henan |
Brand Name: | Sanwu |
Certification: | ISO CCC |
Model Number: | ACSR-007 |
Minimum Order Quantity: | 1000M |
---|---|
Price: | Negotiable |
Packaging Details: | New Wooden drum, reel, circle, or according to customers request. |
Delivery Time: | 1-15days |
Payment Terms: | L/C, T/T, Western Union, MoneyGram |
Supply Ability: | 200 tons per day |
Life Span: | More Than 30 Years | Factory: | Yes |
---|---|---|---|
Voltage: | MV / LV | Keywords: | ACSR Bare Cable |
Dimension: | 0.5--1000mm2 | Application: | Overhead |
Highlight: | Rabbit Aluminium Conductor Steel Reinforced,240/40Mm2 Aluminium Conductor Steel Reinforced,240/40Mm2 acsr rabbit conductor |
ACAR / AAAC / AAC ACSR 240/40 mm2 Rabbit conductor Overhead aluminum bare conductors
Material Standard:
ASTM-B232 Standard specification for Concentric-Lay-Stranded Aluminum 1350 Conductors
BS215-2 aluminum conductors steel-reinforced —For overhead power transmission
DIN48204 Steel reinforced aluminum stranded conductors
IEC209 Aluminum stranded conductor steel reinforced
We could produce most of the standards cables, such as ASTM, BS, CSA, DIN, GB and IEC standards, etc.
Code | Size (AWG/MCM) | Number of Strands(mm) | Weight(kg/km) | Rated Strength(kg) |
Rose | 4 | 7*1.96 | 58.3 | 399 |
Iris | 2 | 7*2.47 | 92.7 | 611 |
Pansy | 1 | 7*2.78 | 117 | 740 |
Poppy | 1/0 | 7*3.12 | 147.5 | 897 |
Aster | 2/0 | 7*3.5 | 186 | 1375 |
Applications
Conductor(AAC and ACSR) have been widely used in power transmission lines with various voltage levels,because they have such good characteristics as simple structure,convenient installation and maintenance,low cost large transmission capacity.And they are also suitable for laying across rivers valleys and the places where special geographical features exist.
Service Performance:
(1). The permissible long-time operating temperature for aerial conductor is 70℃.
(2). Under the circumstance that rare climate is occurring and ice coverage rate low in heavy ice area, the biggest stress of cable at the lowest point of the sag should not exceed 60% of the short-time destructive power.
(3). When connecting conductors, the conductor beside the connecting tube cant be prominent. Otherwise, the force on the operating conductors will be unbalanced. After connectors are install, the connecting tube should be painted by moisture-proof varnish in order to protect it from corrosion.
(4). Under installation, the arc downing stress of all the conductors should be the same. With in the permissible distance of crossing buildings or dropping to the ground, the stress can be 10-15% higher than regular stress.
Contact Person: Alex Yang
Tel: 86-13233918312
PVC XLPE PE Insulated B-232 B-500 Aluminium Conductor Cable
Underground BS 215 Bare 95mm AAC Ant Conductor
ASTM BS All Aluminium Conductor For Overhead Transmission Line
Combined Light Weight ASTM DIN AACSR Conductor
Silver Coated Steel Core AACSR 0.6/1kv Overhead Aluminum Wire